Piping
Franklin Electric
Narrow Your Results
Mfr / Trade Name
Category - Main
Flexible Piping
- List View
- Gallery View
Page of 1 |
Flexible Ducting Connector With Clamps
Item No. DCT-400-F
Works on OPW AXP40 and Franklin DCT-400 Ducting
1-1/2 Inch X 1000 Foot Secondary Contained Xp Pressure/Suction Product Piping
Item No. XP-150-SC-1000
1-1/2 Inch X 1500 Foot Secondary Contained XP Pressure/Suction Product Piping
Item No. XP-150-SC-1500
No possibility of piping layer delaminating due to the layered piping construction of high-grade material
1-1/2 Inch X 500 Foot Secondary Contained Xp Pressure/Suction Product Piping
Item No. XP-150-SC-500
No possibility of piping layer delaminating due to the layered piping construction of high-grade material
1-3/4 Inch X 500 Foot Secondary Contained Xp Pressure/Suction Product Piping
Item No. XP-175-SC-500
No possibility of piping layer delaminating due to the layered piping construction of high-grade material
2 Inch X 200 Foot Secondary Contained Xp Pressure/Suction Product Piping
Item No. XP-200-SC-200
No possibility of piping layer delamination due to the layered piping construction of high-grade material
Secondary Test Boot For Xp-100-Sc Pipe
Item No. STB-100
Boots are made using fuel-resistant nitrile rubber
Secondary Test Boot For Xp-175-Sc Pipe
Item No. STB-175
Boots are made using fuel-resistant nitrile rubber
Secondary Test Boot For Xp-200-Sc Pipe
Item No. STB-200
Boots are made using fuel-resistant nitrile rubber
4 Inch X 100 Foot Pipe Ducting
Item No. DUCT-400-100
This updated design features intergrated flat, non-corrugated sections which provide falt sealing surgaces for tight entry boot connections. New ducting installs directly to the entry boot with no need for an extra buching or V-seal. Thick, corrugated polyethylene construction prevents collapse under the weight of back fill.
4 Inch X 250 Foot Pipe Ducting
Item No. DUCT-400-250
This updated design features intergrated flat, non-corrugated sections which provide falt sealing surgaces for tight entry boot connections. New ducting installs directly to the entry boot with no need for an extra buching or V-seal. Thick, corrugated polyethylene construction prevents collapse under the weight of back fill.
Secondary Test Boot For Xp-150-Sc Pipe
Item No. STB-150
Boots are made using fuel-resistant nitrile rubber
2 Inch X 100 Foot Secondary Contained Xp Pressure/Suction Product Piping
Item No. XP-200-SC-100
No possibility of piping layer delamination due to the layered piping construction of high-grade material